OBEX Fire Classified Facade Sealing Solutions

LONDON | UK The Perfume Factory

This development is over 18m tall, so required the OBEX CORTEX 0500FR Class B Membrane to comply with the regulations. This membrane is tested to EN13984, so also meets the required water-penetration performance standard.

LONDON | UK Oval Village

This is another landmark project where the OBEX CORTEX 0500FR Class B Membrane and the 0771FR Class B Paste Adhesive were specified - critical to its achieving the necessary performance standards and fire-classification.

BIRMINGHAM | UK Kent Street Baths

OBEX supplied the CORTEX 0270FR Score’N’Snap Cement Board system, ensuring the project had a robust, durable cement-based sheathing board, but without the considerable cost of traditional cutting equipment and dust extraction.

OBEXGLOBAL.COM | 53

Powered by